Oreva Group Spent Only 12 Lakh Of Allotted 2 Crore On Morbi Bridge Renovation \
3 min read
\
\

Oreva Group Spent Only 12 Lakh Of Allotted 2 Crore On Morbi Bridge Renovation

05-Nov-2022
Morbi Bridge
Ahmedabad-based Oreva group which is a subsidiary of Ajanta was responsible for the renovation and repair of the colonial-era suspension cable bridge in Morbi Morbi: The probe in the Morbi Bridge Collapse case revealed that Overa Group spent only Rs 12 lakh on renovation. The group was allotted Rs 2... The post appeared first on .
05-Nov-2022 National
\
Oreva Group Spent Only 12 Lakh Of Allotted 2 Crore On Morbi Bridge Renovation \
3 min read
\
\

Oreva Group Spent Only 12 Lakh Of Allotted 2 Crore On Morbi Bridge Renovation

05-Nov-2022
Morbi Bridge
Ahmedabad-based Oreva group which is a subsidiary of Ajanta was responsible for the renovation and repair of the colonial-era suspension cable bridge in Morbi Morbi: The probe in the Morbi Bridge Collapse case revealed that Overa Group spent only Rs 12 lakh on renovation. The group was allotted Rs 2... The post appeared first on .
05-Nov-2022 National
\